A dedicated modular operation theatre complex built alongside a connected ICU wing, designed for high patient throughput with centralized monitoring and medical gas supply.
This project involved building a three-OT modular complex for a growing hospital in Gorakhpur, directly connected to a new ICU wing for smoother post-operative patient transfer.
From civil coordination to final commissioning, our team handled the complete medical gas pipeline network, OT lighting, and ICU bed-side monitoring integration.
| Client | Anita Srivastava |
| Location | Gorakhpur, Uttar Pradesh |
| Category | Modular OT Complex |
| Scope | 3 OTs, 12-Bed ICU, Gas Pipeline |
| Duration | 12 Weeks |
| Year Completed | 2023 |
| Support | AMC & After-Sales Service |
From ICU beds to the medical gas pipeline, everything was installed with great attention to detail. Pricing was transparent and fair throughout.
